Asbestos » SSDS http://asbestos.hazchem.com.au/wordpress Asbestos Removal, Audits, & Plans Thu, 10 Oct 2013 21:48:50 +0000 en-US hourly 1 http://wordpress.org/?v=3.6 NQ21608.05 RBT (0874) Buildings 176 & 235 RAAF, Townsville http://asbestos.hazchem.com.au/wordpress/?p=324 http://asbestos.hazchem.com.au/wordpress/?p=324#comments Thu, 19 Sep 2013 04:00:38 +0000 admin http://asbestos.hazchem.com.au/wordpress/?p=324 Continue reading ]]> Pre-start meeting at 08:00 hours, Friday the 20th September, 2013:

Who:

Electrician Josh Milton (0422 446 899);
Asbestos Removalist David Stathooles (0417 619 132); and
Asbestos Assessor Lawrie Lyons (0437 008 193).

Where: Building 176, RAAF, Townsville.

What:

Noting item 3 involves electrician familiar with building to help locate and isolate heater banks.

1. The asbestos background and reassurance air monitoring and reporting in relation to RBT Buildings 176 & 235;
2. The asbestos survey of RBT buildings 176 & 235 to validate an existing survey report.
3. Location of, and assessment of heater banks within the air-conditioning system of RBT buildings 176 & 235.

]]>
http://asbestos.hazchem.com.au/wordpress/?feed=rss2&p=324 0
NQ21611 – Demolition of Buildings J0762 & J0753, Lavarack Barracks http://asbestos.hazchem.com.au/wordpress/?p=276 http://asbestos.hazchem.com.au/wordpress/?p=276#comments Mon, 09 Sep 2013 20:57:51 +0000 admin http://asbestos.hazchem.com.au/wordpress/?p=276 Continue reading ]]> works are as following to Buildings 0229/J0762 and 0229/J0753 (see attached Site Plan):

Both Buildings are B Class Asbestos – Bonded. Subcontractor will literally spray with epoxy and remove. No ARCP to be reviewed. Carry out Air Monitoring prior to demolishment of Buildings – Friday 13th September, 2013 Carry out Air Monitoring during the removal of buildings – Monday 16th September, 2013 Carry out Air Monitoring after the removal of buildings – Tuesday 17th September, 2013 Supply a report to capture Air Monitoring data.
Complete DCT requirement. ALL OF THE ABOVE WORKS ARE TO BE COMPLETED IAW WITH ASBESTOS MANAGEMENT PLAN (as previously issued)

Work Requests are as follows:

Building 0229/J0762 140228076
Building 0229/J0753 140228077

==

Contractor: Garith Jackson 0434 807 844

==

Air monitoring prior to being demolished was completed on Friday the 13th;
Air monitoring during strip out going ahead as planned on Tuesday the 10th.

]]>
http://asbestos.hazchem.com.au/wordpress/?feed=rss2&p=276 0
NQ21611 – Demolition of Non Habitable Facilities Many Peaks. http://asbestos.hazchem.com.au/wordpress/?p=221 http://asbestos.hazchem.com.au/wordpress/?p=221#comments Tue, 13 Aug 2013 05:35:45 +0000 admin http://asbestos.hazchem.com.au/wordpress/?p=221 Continue reading ]]> NQ21611 – Demolition of Non Habitable Facilities Many Peaks.

Jade Collison | Contracts Administrator
Serco Sodexo Defence Services
BLD 2670 Gallipoli Drive, Lavarack Barracks, QLD, 4813
P: +61 7 4411 1203 | F: +61 7 4411 1213 | M: 0467 746 574
jade.collison@ssds.com.au | www.ssds.com.au

==

201308080-1

]]>
http://asbestos.hazchem.com.au/wordpress/?feed=rss2&p=221 0